/ CZ 5A Multi-Unit Residential 9 Stories • 177 Units
Crosstown Parkway Apartments
Kalamazoo, MI
Climate Zone 5A
121,438 ft²
9 Stories
177 Units
Built 1977
Running simulations... 0 of 4 scenarios complete
Compliance Status
PASS
Post-retrofit meets ASHRAE 90.1 EUI target
Post-Retrofit EUI
11.90 kWh/ft²
40.6 kBtu/ft²
vs Audette 90.1
−24%
Below 90.1 reference (15.68 kWh/ft²)
Total Reduction
−48%
From baseline 23.01 kWh/ft²
EUI Scenario Comparison
Component Comparison

Existing condition vs ASHRAE 90.1 code requirement vs post-retrofit

Component Existing 90.1 Code Post-Retrofit Meets Code?
Measures Addressed
Category Component Existing Required Severity Measures
Remaining Compliance Gaps
Category Component Existing Required Gap Severity
Untitled Building / CZ 4A Office
0, 0 ft
Click "Add Story" to begin
Retrofit Measures Timeline
Total Investment
$2.69M
Across all 9 measures
Energy Reduction
48%
From baseline EUI
Timeline
2027–2038
11 year implementation
Measure Count
9
Individual retrofit actions
Implementation Timeline
Measure Details
Year Measure Type Cost Elec Reduction (kWh) Gas Reduction (kWh) Measure Life
Cumulative Energy Reduction (2026–2050)
5.1b Building Performance Standard — ASHRAE Template
2020 Green Communities Criteria (V2.0) — Editable application form with auto-computed fields
Project Information
Project Name
Date
Applicant Organization
Contact Name
Phone
Email
Energy Modeler Information
Modeling Company
Energy Modeler
Phone
Email
Energy Modeling Software
Project Location
PREBUILD
POSTBUILD
State
Zip Code
Total Conditioned Area (sf)
Energy Information
PREBUILD
POSTBUILD
State/Local Energy Code
5.2a Avg Energy Savings
5.2a Points Achieved
EUI excl. Renewables (kBtu/sf)
EUI incl. Renewables (kBtu/sf)
Emissions — National
PREBUILD
POSTBUILD
Emissions excl. Renewables (tCO2e)
Emissions incl. Renewables (tCO2e)
5.1b Compartmentalization
Verification Method
Unit airflow in CFM/sfbe (average airflow by unit type)
Target Method (0.40 CFM/sf)
Additional Unit (2)
Additional Unit (3)
20% Improvement Method
Additional 20% Unit (2)
Additional 20% Unit (3)
Renewable Energy (5.3b)
PREBUILD
POSTBUILD
Annual Renewable Energy (kWh)
Stories of Tallest Building
Option 1: % Renewable
I General Information
Building Name
Building Address, City
Common Space Area (ft²)
Total Conditioned Area (ft²)
II Building Modeled Energy Consumption
End-Use Units Annual Baseline Proposed Design % Improvement
Electric (kWh)
HeatingkWh
CoolingkWh
Domestic Hot WaterkWh
VentilationkWh
LightingkWh
Appliance & Plug LoadskWh
RenewableskWh
MiscellaneouskWh
Gas (kBtu)
Space HeatingkBtu
Domestic Hot WaterkBtu
ApplianceskBtu
Fuel Oil (kBtu)
Space HeatingkBtu
Domestic Hot WaterkBtu
Electric ConsumptionkWh
0
0
Gas ConsumptionkBtu
0
0
Oil ConsumptionkBtu
0
0
Total ConsumptionkBtu
0
0
Total Consumption/ft²kBtu/ft²
0.00
0.00
III Building Modeled Cost (only if using cost method)
End-Use Units Annual Baseline Proposed Design % Improvement
Electric ($)
Heating$
Cooling$
Domestic Hot Water$
Ventilation$
Lighting$
Appliance & Plug Loads$
Renewables$
Miscellaneous$
Gas ($)
Space Heating$
Domestic Hot Water$
Appliances$
Fuel Oil ($)
Space Heating$
Domestic Hot Water$
Electric Cost$
$0
$0
Gas Cost$
$0
$0
Oil Cost$
$0
$0
Total Cost$
$0
$0
Total Cost/ft²$/ft²
$0.00
$0.00
IV Energy Improvements (Moderate/Substantial rehab only)
# Prior Condition of Building Feature Brief Narrative of the Energy Improvement
V Signatures
Energy Modeler
Project Team Contact
I General Information
Building Name
Building Address, City
Common Space Area (ft²)
Total Conditioned Area (ft²)
II Building Modeled Energy Consumption
End-Use Units Annual Baseline Proposed Design % Improvement
Electric (kWh)
HeatingkWh
CoolingkWh
Domestic Hot WaterkWh
VentilationkWh
LightingkWh
Appliance & Plug LoadskWh
RenewableskWh
MiscellaneouskWh
Gas (kBtu)
Space HeatingkBtu
Domestic Hot WaterkBtu
ApplianceskBtu
Fuel Oil (kBtu)
Space HeatingkBtu
Domestic Hot WaterkBtu
Electric ConsumptionkWh
0
0
Gas ConsumptionkBtu
0
0
Oil ConsumptionkBtu
0
0
Total ConsumptionkBtu
0
0
Total Consumption/ft²kBtu/ft²
0.00
0.00
III Building Modeled Cost (only if using cost method)
End-Use Units Annual Baseline Proposed Design % Improvement
Electric ($)
Heating$
Cooling$
Domestic Hot Water$
Ventilation$
Lighting$
Appliance & Plug Loads$
Renewables$
Miscellaneous$
Gas ($)
Space Heating$
Domestic Hot Water$
Appliances$
Fuel Oil ($)
Space Heating$
Domestic Hot Water$
Electric Cost$
$0
$0
Gas Cost$
$0
$0
Oil Cost$
$0
$0
Total Cost$
$0
$0
Total Cost/ft²$/ft²
$0.00
$0.00
IV Energy Improvements
# Prior Condition of Building Feature Brief Narrative of the Energy Improvement
V Signatures
Energy Modeler
Project Team Contact

Audette Import

Upload Audette export files to populate building data, measures, and decarbonization pathways.

Drop Audette export file here
CSV, XLSX, or JSON
Supported Formats
Audette Portfolio Export (CSV/XLSX) — building baseline, end-uses, measures, pathway
Audette Measures Export (CSV) — ECM list with savings, costs, sequencing
Audette JSON Export (JSON) — complete building data package
Utility Bills (CSV) — 12-month electricity/gas consumption
LEED V5 O+M — Decarbonization & Energy
Prerequisites & Credits: EAp1 Min Energy, EAp3 BAU Carbon, EAc1 GHG Reduction, EAc5 Decarb Plans
Platinum Eligibility: Checking EAc1 + EAc5 achievable points...

Prerequisites

EAp1 Operations Assessment Not Started
EAp2 Min Energy Performance Not Started
EAp3 BAU Carbon Projection Not Started
EAp4 Refrigerant Management Not Started

Credits

EAc5 Decarb Plans 5 pts Not Started
EAc1 GHG Reduction 12 pts Not Started
Optimized Energy Perf. varies Not Started
Refrigerant Impact varies Not Started

Data Completeness

Energy Baseline 0% Not Started
BAU Projection 0% Not Started
Decarb Plan 0% Not Started
GHG Reduction 0% Not Started
Building Information
Building Name
Type
Area (ft²)
Climate Zone
Year Built
12-Month Energy Data
MonthElectricity (kWh)Natural Gas (therms)Other (kBtu)Total (kBtu)
January0
February0
March0
April0
May0
June0
July0
August0
September0
October0
November0
December0
TOTAL0000
Performance Metrics
Site EUI (kBtu/ft²)
Source EUI (kBtu/ft²)
ENERGY STAR Score
Threshold ≥ 60
End-Use Breakdown
End UsekWh%
Heating
Cooling
DHW
Lighting
Equipment
Fans/Pumps
Projection Settings
Base Year
Grid Region
Grid Carbon Intensity (kgCO2e/kWh)
BPS Jurisdiction
Projection Table
YearScope 1 (tCO2e)Scope 2 (tCO2e)Total (tCO2e)Grid FactorBPS LimitFine Exposure
BAU vs Decarbonized Pathway
1. Carbon Reduction Targets
Target YearTarget (tCO2e)% Reduction from Baseline
2. Efficiency Measures
Measure NameTypeAnnual Energy Savings (kWh)Annual GHG Reduction (tCO2e)Capital Cost ($)Payback (yrs)Impl. YearStatus
3. Electrification Strategy
Fossil EquipmentFuel TypeReplacementTarget YearStatus
Gas Water HeaterNatural Gas
4. Renewable Energy Plan
RE Type
Capacity (kW)
Annual Generation (kWh)
% of Consumption
Cost ($)
5. Refrigerant Transition
EAp4 Prerequisite: Not Started
EquipmentRefrigerant TypeCharge (lbs)GWPLeak Rate (%)Annual Emissions (tCO2e)Replacement RefrigerantTarget Year
0.00
Total Refrigerant Emissions0.00
6. Implementation Schedule
Implementation Timeline (Gantt)
Total Capex ($)
Annual Savings ($)
Simple Payback (yrs)
NPV ($)
7. Progress Tracking
Baseline GHG
Post-Measures GHG
% Reduction
Estimated Points
Emissions Breakdown
MetricBaselinePost-MeasuresReduction% Change
Total GHG (tCO2e)
Scope 1 (Combustion)
Scope 2 (Grid)
Electrification Progress
Thermal Load Electrified
0%
100% electrification bonus: +2 points
Points Eligibility — EAc1 GHG Reduction
GHG Reduction %
Base Points (5% = 1pt)
Electrification Bonus
0
Total EAc1 (max 12)
Platinum Check: Complete GHG analysis to evaluate eligibility
Export Documents
Compliance Checklist
RequirementCategoryStatus
EAp1 Operations Assessment completedPrerequisiteNot Started
EAp2 Minimum Energy Performance (ENERGY STAR ≥ 60)PrerequisiteNot Started
EAp3 BAU Carbon Projection documentedPrerequisiteNot Started
EAp4 Refrigerant Management planPrerequisiteNot Started
EAc5 Decarbonization plan with targets & measuresCredit (5 pts)Not Started
EAc1 Demonstrated GHG reduction from baselineCredit (12 pts)Not Started
Optimized Energy Performance documentationCredit (varies)Not Started
Refrigerant impact assessmentCredit (varies)Not Started
12-month energy data submittedDataNot Started
End-use breakdown documentedDataNot Started
Electrification strategy documentedPlanNot Started
Renewable energy plan documentedPlanNot Started
Audette AI Assistant
Audette AI Assistant
I can help analyze compliance, edit the building model, run simulations, and answer code questions.

Re-run All Scenarios

This will run 4 EnergyPlus simulations (Baseline, DOE Reference, 90.1, and Retrofit). Each simulation takes 1–3 minutes. Dashboard values will update with live results when complete.